Woosh Coach Portal V1 — Scope QA
Visual & tabular conformance check against the signed Plan & Wireframes (Version 2).
Overall: NOT READY for V1 plan acceptance — key dashboard/search gaps remain, and invite model differs from plan.
*Seats / Earnings may appear as CTAs or secondary flows even if not always in top nav.
1) Quick scorecard (read this first)
| Status |
Page |
What the plan asks for |
What live does |
| PARTIAL |
C1 Sign in |
Email/password, Create account, Google. No password reset in V1. |
Email/password + Google. Forgot password present. Create account not shown. |
| FAIL |
C2 Activity dashboard |
3 tiles (Connected / Practiced 7d / Pro) + 12-week chart + Recently active (5). |
/coach/ is a Students roster welcome page. No activity tiles/chart. |
| FAIL |
C3 Student list |
Search by name. Sort by last practiced. Columns: Pro + Last practiced. |
List exists. No search. Sorted “newest first”. Columns: Link/Sharing/Membership/Linked/Gift Pro. |
| PARTIAL |
C4 Student |
Sessions, last practiced, Pro, trend, top 3 mistakes. Empty: “No practice yet.” |
Demo report is rich (putts, make rate, top mistakes, charts). Empty wording differs. |
| FAIL |
C5 Link & code |
One durable personal link + code. No replace button in Phase 1. |
Invites page: direct link + single-use codes that expire + “New code”. |
| PASS |
C6 Profile |
Name, academy/team, contact. Save. |
Name / Academy / Email + Save present. |
| PASS |
S1 Join |
Code/link join, consent, Accept / Not now, invalid-code message. |
Works. Invalid text exact match. Consent checkbox wording differs slightly. |
| PASS |
S2 My coaches |
List coaches, disconnect confirm, empty state + enter code. |
Empty state + Enter a Coach Code present. Disconnect not fully exercised. |
| PASS |
Coach guide |
Short how-to delivered. |
/coach/guide/ live. |
| OUT |
Seats / Gift Pro |
Not in Phase 1. |
Seat CTA / Gift Pro actions observed on Students. |
| OUT |
Earnings / commissions |
Not in Phase 1. |
Earnings flow previously observed / documented in guide. |
2) Side-by-side: Scope wireframe vs Live home
Biggest visual gap — plan shows an Activity dashboard; live opens on Students roster.
SCOPE (C2) — Activity dashboard 3 tiles + chart + recently active
LIVE — /coach/ Students home roster + invite CTAs, no activity tiles
3) Screenshot gallery (live product)
LIVE Invites (maps to C5) Direct invite link + single-use expiring codes + New code
LIVE Student demo report (maps to C4) Rich analytics + Top Putting Mistakes
LIVE Join / Add a coach (S1)
LIVE My coaches empty state (S2)
4) Defect register (actionable)
| ID |
Pri |
Status |
Issue |
Suggested fix |
| D1 |
P0 |
FAIL |
Activity dashboard (C2) missing. |
Add Connected / Practiced 7d / Pro tiles, 12-week sessions chart, recently active (5). |
| D2 |
P0 |
FAIL |
No student name search on roster. |
Add type-ahead search; empty: “No students match your search.” |
| D3 |
P0 |
FAIL |
Invite model is single-use/expiring with New code. |
Align to durable personal link/code, or get written plan change. |
| D4 |
P0 |
OUT |
Gift Pro / Seats / commissions not Phase 1. |
Hide/gate until amended scope, or amend signed plan. |
| D5 |
P1 |
PARTIAL |
Create account missing; Forgot password present. |
Match V1 auth settings. |
| D6 |
P1 |
PARTIAL |
Roster sort/columns differ (newest linked vs last practiced). |
Add Last practiced column; default sort by recency of practice. |
| D7 |
P1 |
PARTIAL |
Consent / empty-state wording differs from plan. |
Align copy to plan S1c / “No practice yet.” |
| D8 |
P2 |
NOTE |
Student analytics are richer than plan. |
Confirm as approved design upgrade. |
5) Done-when checklist
| Status | Acceptance item from plan | Evidence |
| PARTIAL |
Connection works end to end |
Invite/join/consent UI works; durable-code model differs |
| PARTIAL |
Student data shows (sessions, mistakes, trends) |
Demo report strong; empty student still sparse |
| PASS |
Students can leave / multi-coach |
Join + My coaches flows support multi-coach messaging |
| PASS |
Live + coach guide |
Live on coach.wooshputting.com; Guide page present |
Recommendation: Do not claim V1 acceptance against Version 2 wireframes without a written scope change.
Either restore C2–C5 plan behaviors and gate monetization, or amend the signed plan to cover Invites, richer analytics, and Gift Pro/Seats.
6) Route map (quick reference)
| Plan route | Live route | Notes |
| /coach/login | /coach/login/ | Auth |
| /coach/ (C2 Activity) | /coach/ | Students home instead of activity dashboard |
| /coach/students (C3) | /coach/students/ → /coach/ | Redirects to home roster |
| /coach/student (C4) | /coach/student/?id=… | Detail + demo mode |
| /coach/link (C5) | /coach/link/ → /coach/invites/ | Remapped to Invites |
| /coach/profile (C6) | /coach/profile/ | OK |
| /join (S1) | /join/ | OK |
| /my-coach (S2) | /my-coach/ | OK |